STAFF REPORTER
GUWAHATI: Railway authorities are carrying out repair works on Old Saraighat Bridge. Traffic, both incoming and outgoing, have been diverted via the new bridge. The repair works will be completed in three days as intimated by Railway authority.
Also Watch: Assam Sahitya Sabha to go digital