Numaligarh Refinery Limited (NRL) Recruitment 2024 - Sr. Officer- Metallurgy Vacancy, Job Openings

Numaligarh Refinery Limited (NRL) is recruiting for Sr. Officer- Metallurgy Vacancies, Apply Now.
Numaligarh Refinery Limited (NRL) Recruitment 2024 - Sr. Officer- Metallurgy Vacancy, Job Openings
Published on: 

NRL released the latest job notification for the recruitment of Sr. Officer- Metallurgy. Interested candidates can apply before the last date. Check more details on the NRL job vacancy 2024.

Numaligarh Refinery Limited Recruitment 2024

Numaligarh Refinery Limited is inviting applications from eligible candidates for the posts of Sr. Officer- Metallurgy. Desirous candidates can check all the job details of no of posts, age limit, salary, qualification, etc prescribed below:

Numaligarh Refinery Limited (NRL) Job Openings

About Job Requirement Details

Post Name: Sr. Officer- Metallurgy

Posts: 01

Location: Assam

Salary: Not Mentioned

Last Date: 03/02/2024

Age: 30 years

Application Fees: N/A

Educational Qualification for Numaligarh Refinery Limited (NRL) Job Vacancy:

Educational Qualification: To apply for the post of Sr. Officer- Metallurgy at Numaligarh Refinery Limited (NRL) , the candidate should have completed Bachelor’s degree in Metallurgy / Metallurgical and Materials Engineering of minimum 04 years duration with minimum 65% marks

How to Apply for Numaligarh Refinery Limited (NRL) Job Openings:

Interested and eligible candidates can apply online for these vacancy by visiting at official online portal of NRL.

Disclaimer: Provided by the Numaligarh Refinery Limited (NRL)

About Numaligarh Refinery Limited (NRL) : The Numaligarh Refinery, located at Morangi, Golaghat district, Assam in India, is a refinery which is a joint venture between Oil India which is under the ownership of Ministry of Petroleum and Natural Gas of the government of India and Assam Oil, Ministry of Mineral and Petroleum, government of Assam. It opened in 1999.

As of 2014, it had a capacity of 3 million metric tonnes per year. In January 2019, the Cabinet Committee on Economic Affairs approved plans to increase the refinery's capacity to 9 million metric tonnes per year.

Top News

No stories found.
Sentinel Assam
www.sentinelassam.com